The flat roofing material must go up the wall a minimum of 12 or up the wall and over the top of the wall if the wall is less than 12 high.
Flat roof to pitched roof junction detail simpson tie.
This latest project was in early december in lambeth ontario for a residential home that had an existing sloped or shingled roof that needed to tie into a ne.
Flashing and more roofing compound are used to weatherproof the.
This flexibility can help create open space inside the home or a more spacious attic.
In some regions stick frame roofs may be preferred when flexibility in the roof shape is a desirable design feature.
A very important detail is where the flat roof is connecting the pitch roof.
In the event of a natural disaster the pitched roof above can be lost without losing the integrity of the structure below.
The varied roof lines that are possible with stick frame homes can also enhance curb appeal and market value for some homebuyers.
The roof needs to be tied in by lifting up some of the original tiles on the existing roof and then allowing the flat roof to run slightly underneath.
Step 4 tie the roof in.
Here stone veneer is installed below the surface of the tile roof where freeze thaw cycles are tearing the mortar apart.
Residential low slope roofing can generally be divided up into two broad categories.
Some homeowners in an effort to have the best of both worlds have chosen to build a flat deck concrete roof and place a rafter or truss system above it to have a more traditional roof profile.
After this roofing cement is applied around the complete area and then the missing tiles are replaced.
The vent plate is a 1 2mm thick 300mm long galvanised steel plate which provides a fast and cost effective solution to providing ventilation in the roof space.
Larger flat roofed applications low slope such as residential condominium complexes row homes and town houses and smaller applications such as residential porch and garage transitions from the main home where the slope of the roof changes dramatically.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
The starter strip and first row of shingles must be applied 25 cm from the bottom of the slope roof or main roof above the slope transition.